Project

General

Profile

Roadmap

2.9

about 6 months late (06/01/2022)

76%

17 issues   (13 closed4 open)

2.9.1

25%

8 issues   (2 closed6 open)

2.9.2

0%

8 issues   (0 closed — 8 open)

3.0

17%

35 issues   (6 closed29 open)

Backlogs Produits - Inscription Backlog

PJGN 1.0

Projet PJGN

100%

16 issues   (16 closed — 0 open)